Reconnaissance 16 Mar 2007

16Mar07: Approaching site T2A from Hwy 200 16Mar07: Approaching site T2A 16Mar07:  Approaching site T2A 16Mar07:  Peter taking a GPS reading at site T2A 16Mar07:  View of upper lagoon from Hwy 200 16Mar07:  Peter taking GPS reading at site T2C 16Mar07:  Site T2C 16Mar07:  Approaching site T3A from Boca de Iguanas road
16Mar07:  Center point for site T3A 16Mar07:  Approaching site T1D 16Mar07:  Approaching site T1D 16Mar07:  Approaching site T1D 16Mar07:  Approaching site T1C 16Mar 07:  Approaching site T1C 16Mar07:  Termite nest near site T1C 16Mar07:  Site T1C
16Mar07:  Litterbox at site T1C 16Mar07:  Peter taking GPS reading at site T1C 16Mar07:  Person cutting mangrove across street from beach camp 16Mar07:  Beach camp before everyone arrived 16Mar07:  Beach camp before everyone arrived 16Mar07:  Sewer pump station 16Mar07:  Sewer pump station 16Mar07:  Sewer pump station
16Mar07:  Approaching site T1A 16Mar07:  Site T1A            

Back to top

Arrivals 17 Mar 2007

17Mar07:  Jerry addresses CSUCI group 17Mar07:  CSUCI group 17Mar07:  Earthwatch group 17Mar07:  Jacquie talking with Diane from Earthwatch 17Mar07:  Jerry addresses the Earthwatch group

Presentation of modules and photos of La Manzanilla 18 Mar 2007

18Mar07:  Sudeep and Peter enjoy breakfast at Maria's 18Mar07:  Marina and Vanessa make breakfast while Justin gets a bite 18Mar07:  Jerry giving introductory module 18Mar07:  Sudeep giving ecohydrology module 18Mar07:  Sudeep giving ecohydrology module 18Mar07:  Paco giving vegetation module
18Mar07:  Natalia talking to the group about activities 18Mar07:  Jerry giving presentation about service learning 18Mar07:  La Manzanilla 18Mar07: La Manzanilla 18Mar07:  La Manzanilla 18Mar07:  La Manzanilla 18Mar07:  La Manzanillo
18Mar07:  Dave's restaurant at La Manzanilla 18Mar07:  Plants to be planted at the school (to the left) 18Mar07:  Front of school          

Back to top

First field day 19 Mar 2007

19Mar07:  Beach camp 19Mar07:  Sara, Ariceli, and Veronica construct piezometers 19Mar07:  Veronica and Steve construct piezometers while Don watches 19Mar07:  Steve constructing piezometers 19Mar07:  Steve and Sara constructing piezometers 19Mar07:  Ariceli, Veronica, Sara, and Steve measuring inside length of piezometers 19Mar07:  Ariceli, Veronica, Sara, and Steve measuring inside length of piezometers 19Mar07:  The group inserts the barologgers while Brad observes (but is momentarily distracted)
19Mar07:  Ariceli helps to cut watermelon for lunch 19Mar07:  Barologger hanging at well at Maria's beach camp (BB) 19Mar07:  Setup for lunch at beach camp 19Mar07:  The water quality group comes in near the crocodile pen 19Mar07:  The water quality group comes in near the crocodile pen 19Mar07:  Ariceli and Veronica writing in their journals at site T2A 19Mar07:  Ariceli working the auger at site T2A 19Mar07: First auger hole at site T2A (which we later abandoned)
19Mar07:  Don removing soil from auger at site T2A 19Mar07:  Don augering at site T2A as Ariceli looks on 19Mar07:  Partially augered hole at site T2A (water is visible) 19Aug07:  Adding sand after piezometer has been installed at site T2A 19Mar07:  Sara bringing boat back to site T2A after installing lower stage gage at site T2B 19Mar07:  Sudeep installing metal pole to mount high stage gage at site T2B (near site T2A) 19Mar07:  Mounting upper stage gage at site T2B (near site T2A) 19Mar07:  Sudeep, Steve, and Sara installing upper stage gage at site T2B
19Mar07:  Steve and Sara pose at the installed upper stage gage at T2B 19Mar07:  Truck dumping excavated soil from near beach camp in lagoon 19Mar07:  Soil pile waiting to be put into lagoon 19Mar07:  Bulldozer pushing soil into lagoon 19Mar07:  Bulldozer pushing soil into lagoon      

Back to top

Second field day 20 Mar 2007

20Mar07:  Steve removing soil from auger at site T1A 20Mar07:  Partially augered hole at site T1A (water is visible) 20Mar07:  Rob from water quality group digging hole for crab pitfall trap at site T1A 20Mar07:  Veronica augering while Steve looks on at Site T1A 20Mar07:  Ariceli and Steve augering at site T1A 20Mar07:  Installed piezometer at site T1A 20Mar07:  Steve augering at site T1C 20Mar07:  Steve augering at site T1C
20Mar07:  Ariceli removing soil from auger at site T1C 20Mar07:  Veronica, John, and Ariceli at site T1C 20Mar07:  Soccer on the beach at beach camp 20Mar07:  Soccer on the beach at beach camp 20Mar07:  Soccer on the beach at beach camp 20Mar07:  Water quality group filtering water at beach camp 20Mar07:  Augering at site T3A 20Mar07:  Augering at site T3A
20Mar07:  Installed piezometer at site T3A 20Mar07:  Pumping water out of piezometer at site T3A 20Mar07:  Atmospheric barologger at site T3A (right next to center point flagging) 20Mar07:  Installed piezometer at site T3A        